Calgary Airport - YYC TP4A Lift Station - Earthworks
Working on the lift station
Bluebird Contracting Services was hired to install deep utilities and complete site excavation and backfill.
Bluebird Contracting Services was hired to install deep utilities and complete site excavation and backfill.
This project was an extension of existing roadway and ramp along the new terminal extension. Bluebird was contracted for bulk excavation and backfill, detailed excavation and backfill, site grading, road building, selective demolition and MSE wall construction.
Rambler Fabrication fabricated 24”, 28” and 30’’ expansion barrels for the Syncrude Tailings Relocation project.
Rambler Fabrication fabricated various pipe and structural anchors for Syncrude Tailings Relocation. This project is the largest project to date for Rambler.
This project included a four-piece modular substation and control room, as well as variable voltages and systems integrated into a complete package with a roof-mounted HVAC system.
The project included an integrated pump substation for Syncrude’s Mildred Lake Mine Replacement project. The substations included two 2,500-hp variable frequency drives, distribution, custom exterior 5kv connection boxes and HVAC.
Whaler was the mechanical contractor on site for the construction of a new Sweetening Unit at the Cochrane Extraction Plant near the town of Cochrane, Alberta. Whaler’s scope of work included provision to procure, fabricate, deliver, secure and install all materials and equipment, provide supervision, labour, consumables, testing equipment, tools and other necessary means, as outlined in the project drawings and documents, to complete the Scope of Work.
Whaler acted as the General Contractor of mechanical and subcontract management of electrical, instrumentation and insulation at Wellsite 101, a 10-pair SAGD wellpad consisting of 10 wellhead control modules, group and test separators, pump building, 1A building, MCC buildings and nine-track modules.