Calgary South Health Campus - Precision Metal

Trotter & Morton Precision Metal was awarded the South Health Campus Phase 1 project

Phase 1 included 1,689,428 ft² of hospital area, 164,591 ft² of interstitial space, and 702,108 ft² of a two level underground parkade.

Stainless steel products fabricated: 1000 ft. of guard/hand rails, 120 lab counters/sinks, 2000 ft² of wall cladding, 65 OR/Lab cabinets, 180 shelves, 300 shower rods, numerous hoods, vents, and other miscellaneous Items.

Jamieson Place - Electrical

Trotter & Morton was the Electrical Construction Manager for the Jamieson Tower.
Jamieson Place is a 38-story commercial development comprised of a 3-story podium and an office tower. It is a landmark building with strong architectural signature elements at street level and the skyline. 

Stampede Casino

Building a parkade

This project involved site cuts and fills, underground site services, gravels to sub-grade, buld excavation and detailed excavation and backfill for a two-level parkade.

Trotter & Morton earthworks and demolition