707 Fifth Street

Client: EllisDon Construction
Division: Earthworks & Demolition
Service Type: Backfill, Demolition, Earthworks, Excavation, Underground Services
Location: Calgary
Company:
Start/End: May 2014

Quick Points

Demolition, removal, and transport of existing below-grade foundations and utilties for three buildings
Excavation of parkade 22 metres below ground level, removing and transporting more than 85,000 cubic metres of material
Detailed excavation for footings, sump pumps, elevator pits, and crane pads
Installation of slab-on-grade gravels and weeping tile system

Project Additional Body Rendered

Setting new standards in earthworks and excavation services

At the height of the excavation phase, Bluebird’s heavy equipment operators expertly navigated seven excavators in tandem within a half-block lot (3,700 square-metres) to maintain the tight project schedule.

The team was able to efficiently remove material at the deepest level of excavation using Bluebird’s custom-designed, triple-stick excavator, a distance that standard excavators can’t reach. In total, over 85,000 cubic metres of material was removed to complete the five-level parkade.

Project Additional Body Rendered

Project Additional Body Rendered

707 Fifth Street

Setting new standards in earthworks and excavation services

At the height of the excavation phase, Bluebird’s heavy equipment operators expertly navigated seven excavators in tandem within a half-block lot (3,700 square-metres) to maintain the tight project schedule.

The team was able to efficiently remove material at the deepest level of excavation using Bluebird’s custom-designed, triple-stick excavator, a distance that standard excavators can’t reach. In total, over 85,000 cubic metres of material was removed to complete the five-level parkade.

Market: 
Location: 
Calgary
Province or State: 
Alberta
Country: 
Quick Points: 
Demolition, removal, and transport of existing below-grade foundations and utilties for three buildings
Excavation of parkade 22 metres below ground level, removing and transporting more than 85,000 cubic metres of material
Detailed excavation for footings, sump pumps, elevator pits, and crane pads
Installation of slab-on-grade gravels and weeping tile system
Project Asset: 
Gallery Media: 
Bluebird Excavation at 707 Fifth
Bluebird Excavation at 707 Fifth
Thumbnail: 
Bluebird Excavation at 707 Fifth
Start / End: 
May 2014