Bonnybrook Waste Water Treatment Plant

Location: Calgary, Alberta, Canada
Year Completed: 2015
Building Trust With Every Job

Project Specifications

Company
trotter & morton building technologies
Contract:
$4M+
Contract Type:
Lump Sum
Scope:
mechanical, mechanical hvac
Sector:
institutional
Markets:
HVAC, commercial, mechanical
Building Type:
Municipal
Client:
City of Calgary
Experience Is The Best Teacher

Project Details

The Bonnybrook Waste Water Treatment Facility was originally built in 1932. Significant modifications and upgrades have been planned by the City of Calgary to increase the facilities treatment capacity and meet growing demands into the mid-2030s. The facilities average capacity was 396 ML/d with a peak capacity of 1,069ML/d, serving 950,000 people. The upgrades added an additional 135ML/d (average) and 1,390ML/d (peak) capacity to the facility and it can now serve 1.37million people.

Trotter & Morton was responsible for BIM modelling, sheet metal, insulation, all plumbing piping and modifications, heating piping and installation of 4 new boilers and boiler venting, make-up air unit installation, HVAC pump supply and installation. Additionally, we modified the existing heat distribution piping within existing gallery spaces and tunnels. The expansion and modifications were all completed while keeping the facility operational.

No additional images