Rambler Fabrication pre-fabricated the pipe spools for installation at Burton Creek Pump station. Fabrication consisted of 2 thru 48 inch carbon steel & stainless steel pipe spools & expansion loops totalling 30,000 diameter inches.

Rambler was responsible for inspection of customer-supplied materials, fabrication, QA/QC & NDE management supplying weekly loads for site installation north of Crowsnest Pass, AB.