This project involved the replacement of the Domestic Water Distribution piping mains within the Jim Pattison Pavilion South with new parallel horizontal piping distribution system on three levels.
Trotter & Morton was responsible for the own forces mechanical scope which included piping installation, insulation, balancing valves, pressure reducing valves, commissioning and quality control.